{"id":28630,"date":"2026-11-24T16:42:00","date_gmt":"2026-11-24T21:42:00","guid":{"rendered":"https:\/\/www.autonocion.com\/us\/?p=28630"},"modified":"2026-11-24T16:42:32","modified_gmt":"2026-11-24T21:42:32","slug":"nuclear-plants-spare-actuators-wiring-check","status":"publish","type":"post","link":"https:\/\/www.autonocion.com\/us\/nuclear-plants-spare-actuators-wiring-check\/","title":{"rendered":"A 10-plant alert went out after wiring defects turned up in two actuators bound for a Kansas reactor&#8217;s emergency feedwater system, the parts that set how fast a steam turbine spins its pump, and every site using them is being advised to confirm its spares energize and stroke"},"content":{"rendered":"<p>Most of us keep a flashlight in a kitchen drawer for when the power goes out. And most of us find out the batteries are dead right at the moment the lights go off, which is pretty much the worst possible time to learn that.<\/p>\n<p>Nuclear plants keep their own version of that drawer, and it&#8217;s a lot better organized than mine. But it turns out someone still has to check what&#8217;s in it. On November 18, Curtiss-Wright Steam and Air Solutions (SAS), a supplier in Summerville, South Carolina, told the Nuclear Regulatory Commission that two actuators it had sold to the Wolf Creek plant near Burlington, Kansas, had wiring defects. The two problems weren&#8217;t connected to each other, and both were caught before either actuator went in.<\/p>\n<p>SAS has now asked the 10 plants that use the same setup to make sure their own spares power up and move the way they should. That&#8217;s Wolf Creek plus Farley, Clinton, Point Beach, Cooper, Hatch, Harris, Watts Bar, Sequoyah and Arkansas Nuclear One.<\/p>\n<p>Nothing failed in service here. SAS filed a preventive notice under the NRC&#8217;s Part 21 rules, which I&#8217;ll get to in a minute, and the advice going out is fairly mild.<\/p>\n<h2>So what does this actuator do?<\/h2>\n<p>After a reactor shuts down, its fuel keeps giving off heat for a long time, so the plant has to keep pushing water in to carry that heat away. Electric pumps do most of that work. But you&#8217;d want at least one pump that keeps going if the plant loses its electricity, and that&#8217;s where the Terry turbine comes in.<\/p>\n<p>A Terry turbine is a steam turbine that runs on steam made by the reactor&#8217;s own leftover heat, and it spins a pump that sends water back where it&#8217;s needed. <a href=\"https:\/\/www.osti.gov\/servlets\/purl\/1529465\" target=\"_blank\" rel=\"noopener nofollow\">Research published through the Department of Energy<\/a> describes these turbopumps that way. Basically, the reactor&#8217;s heat powers the machine that gets rid of the reactor&#8217;s heat, which is a pretty elegant trick if you ask me.<\/p>\n<p>At pressurized water reactors like Wolf Creek, this pump belongs to the auxiliary feedwater system. Boiling water reactors call their version reactor core isolation cooling, or RCIC. Clinton, Cooper and Hatch are the boiling water plants on SAS&#8217;s list, and the other seven run pressurized water reactors.<\/p>\n<p>A turbine with nothing reining it in would spin up as fast as the steam lets it, so it needs a governor. SAS&#8217;s report places the actuators in what it calls the electronic governor speed control system, or EGSCS. The actuator is what does the moving.<\/p>\n<p>The Exlar SR31 is an electric linear actuator. That means a motor and a screw packed into one housing, turning an electrical command into a straight push or pull. The governor uses that motion to hold the turbine, and the pump it drives, at the speed it&#8217;s told to run.<\/p>\n<p>Exlar, the Curtiss-Wright brand behind the SR31, gave the line a 3.3-inch frame, strokes of 5.9 or 10 inches and between 225 and 900 pounds of thrust in <a href=\"https:\/\/www.packworld.com\/trends\/controls-machine-components\/press-release\/13354490\/exlar-corporation-exlar-corporation-integrated-actuators\" target=\"_blank\" rel=\"noopener nofollow\">its product announcement<\/a>. The NRC report doesn&#8217;t say which version Wolf Creek ordered.<\/p>\n<h2>Why does a part that never got installed matter?<\/h2>\n<p>If the two bad actuators were caught before anyone hooked them up, you might figure the story ends right there. I get it. But spares exist to be swapped in quickly, usually because something else has already gone wrong or because an outage schedule is tight. A spare that won&#8217;t power up when you need it is the flashlight in the drawer again, just with a lot more paperwork attached. Plants keep spares around for exactly the moments when nobody has time to troubleshoot a brand-new part.<\/p>\n<p>That&#8217;s why the recommendation is aimed at the shelf and not at the turbines. The report puts it plainly: &#8220;No immediate action is required for customers with Exlar SR31 actuators installed.&#8221; What SAS wants from the 10 sites is a check that every spare SR31 energizes, strokes and works properly.<\/p>\n<p>Energizing means it powers up. Stroking means it travels through its full range of motion and back, which is about the most basic test you can run on something whose only job is to move.<\/p>\n<p>SAS also says it considers the two defects isolated and not a sign of a wider problem, and that it&#8217;s verified every actuator left in its own stock is working.<\/p>\n<h2>What is a Part 21 report?<\/h2>\n<p><a href=\"https:\/\/www.ecfr.gov\/current\/title-10\/chapter-I\/part-21\" target=\"_blank\" rel=\"noopener nofollow\">Part 21<\/a> is the section of federal nuclear rules that makes suppliers and plant operators tell the NRC when a basic component has a defect that could create a substantial safety hazard. It&#8217;s basically the nuclear industry&#8217;s recall notice, except it&#8217;s filed with a federal regulator instead of showing up as a postcard in your mailbox.<\/p>\n<p>The rule gives a company two days from the moment a responsible officer learns about a reportable defect to make the first notification, and 30 days to follow up in writing. SAS listed November 17 as the event date and November 18 as the day it notified the NRC, and the agency published it in <a href=\"https:\/\/www.nrc.gov\/reading-rm\/doc-collections\/event-status\/event\/2026\/20261120en\" target=\"_blank\" rel=\"noopener nofollow\">its event notification report<\/a> on November 20.<\/p>\n<div style=\"display: flex; flex-wrap: wrap; gap: 14px; margin: 24px 0;\">\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Event date<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">Nov. 17<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">Date SAS gave for the event in its Part 21 filing.<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">NRC notified<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">Nov. 18<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">SAS reports two actuators with independent wiring defects, found before installation.<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Published<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">Nov. 20<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">NRC posts it as Event Notification 58540.<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Sites advised<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">10 plants<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">Asked to confirm spare actuators energize, stroke and work.<\/div>\n<\/div>\n<\/div>\n<p>Frankly, these reports are a lot more routine than the word &#8220;defect&#8221; makes them sound. That same November 20 report also carried entries from two hospitals and a uranium enrichment plant in New Mexico.<\/p>\n<p>Small parts end up in big reports pretty often, too. In a piece we ran last week, a blown fuse in a chiller control panel was enough to <a href=\"https:\/\/www.autonocion.com\/us\/1207-megawatt-reactor-washington-shut-down-by-hand-249-both-pumps-blown-fuse\/\">force a manual shutdown at a reactor in Washington state<\/a>. And Arkansas Nuclear One, one of the 10 sites on this list, was in the news earlier this month after a <a href=\"https:\/\/www.autonocion.com\/us\/988-megawatt-arkansas-reactor-lightning-scram-coolant-pumps-838-am\/\">lightning strike knocked out power to its coolant pumps<\/a> and the reactor shut itself down.<\/p>\n<h2>SAS is tightening its own checks<\/h2>\n<p>SAS says it&#8217;ll evaluate spare actuators before they ship, add source surveillance hold points for repairs and new purchases, and build extra checks and functional testing into its inspection and dedication process. Dedication, in nuclear-speak, is how a part built to ordinary commercial standards gets proven fit for a safety job. Source surveillance means sending someone to watch the work at the vendor&#8217;s shop, and a hold point is a stop where nothing moves forward until that person signs off.<\/p>\n<p>The functional testing is arguably the most useful change on that list. A test that powers an actuator up and runs it through its stroke should flag a wiring fault before the box ever leaves the building, and it&#8217;s pretty much the same test SAS is now asking the plants to run on their own spares.<\/p>\n<h2>So what hasn&#8217;t SAS said?<\/h2>\n<p>Quite a bit, actually. The report describes the problems only as wiring defects, so I can&#8217;t tell you whether we&#8217;re talking about a loose connection or a wire landed on the wrong terminal. It also doesn&#8217;t say how many spare SR31s each of the 10 plants keeps on hand, and I&#8217;d expect that number to vary from site to site.<\/p>\n<p>We also don&#8217;t know how long the checks will take or whether any site has already finished them. Plants don&#8217;t usually announce that kind of routine work, so I wouldn&#8217;t hold my breath for a press release.<\/p>\n<p>Todd Johnson, from SAS&#8217;s product engineering group, is listed as the company&#8217;s contact on the filing, and the NRC posted it as Event Notification 58540, with all 10 plants named, on November 20.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Most of us keep a flashlight in a kitchen drawer for when the power goes out. And most of us &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"A 10-plant alert went out after wiring defects turned up in two actuators bound for a Kansas reactor&#8217;s emergency feedwater system, the parts that set how fast a steam turbine spins its pump, and every site using them is being advised to confirm its spares energize and stroke\" class=\"read-more button\" href=\"https:\/\/www.autonocion.com\/us\/nuclear-plants-spare-actuators-wiring-check\/#more-28630\" aria-label=\"Read more about A 10-plant alert went out after wiring defects turned up in two actuators bound for a Kansas reactor&#8217;s emergency feedwater system, the parts that set how fast a steam turbine spins its pump, and every site using them is being advised to confirm its spares energize and stroke\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":28629,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[116],"tags":[],"class_list":["post-28630","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","resize-featured-image"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/28630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/comments?post=28630"}],"version-history":[{"count":1,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/28630\/revisions"}],"predecessor-version":[{"id":28657,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/28630\/revisions\/28657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/media\/28629"}],"wp:attachment":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/media?parent=28630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/categories?post=28630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/tags?post=28630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}