{"id":28099,"date":"2026-11-15T12:30:00","date_gmt":"2026-11-15T17:30:00","guid":{"rendered":"https:\/\/www.autonocion.com\/us\/?p=28099"},"modified":"2026-11-15T05:20:18","modified_gmt":"2026-11-15T10:20:18","slug":"89-year-old-lock-gate-mississippi-500-ton-floating-crane","status":"publish","type":"post","link":"https:\/\/www.autonocion.com\/us\/89-year-old-lock-gate-mississippi-500-ton-floating-crane\/","title":{"rendered":"An 89-year-old lock gate on the upper Mississippi was lifted out by a 500-ton floating crane and replaced in a 12-hour closure, one of eight steel leaves up to 33 feet tall swapped in four closures at a lock that passes close to 5,000 barges a year"},"content":{"rendered":"<p>Pretty much everyone has a door at home that&#8217;s seen better days. It sticks a little, the hinges complain, and you keep it going with a squirt of lubricant and a well-placed shoulder for another few years. The Army Corps of Engineers has been doing a much bigger version of that with the gates at Lock and Dam 9 on the upper Mississippi since they went in back in 1937.<\/p>\n<p>This summer, it finally stopped patching and swapped them out.<\/p>\n<p>Lock and Dam 9 sits at river mile 647.9, near Lynxville, Wisconsin, and the job covered the miter gates on its main lock chamber. The Corps&#8217; St. Paul District did the work with its sister district in Rock Island and that district&#8217;s floating heavy-lift crane, a rig called The Quad Cities. According to the <a href=\"https:\/\/www.dvidshub.net\/news\/572101\/stronger-gates-stronger-river-lock-and-dam-9-upgrade-secures-upper-mississippi-navigation\" target=\"_blank\" rel=\"noopener nofollow\">St. Paul District&#8217;s write-up of the project<\/a>, the new gates match the old ones in length, width and height. They&#8217;re also 50% heavier.<\/p>\n<h2>So what&#8217;s a miter gate, anyway?<\/h2>\n<p>If you&#8217;ve never watched a towboat lock through, here&#8217;s the short version. A miter gate is basically a giant double door. Two steel leaves swing out from the chamber walls and meet in a shallow V that points upstream, and the water pushing against that V is what keeps the door shut tight.<\/p>\n<p>The lock raises or lowers boats by letting water in or out of the chamber while those doors are closed. Each trip through is called a lockage, and a long tow often has to be broken up and taken through in more than one. Which means every hour the lock&#8217;s out of action, boats start stacking up.<\/p>\n<p>That&#8217;s why the Corps didn&#8217;t just shut the river for a week. Its <a href=\"https:\/\/ndc.ops.usace.army.mil\/ords\/ntni\/print_nav_notice?in_nav_notice_number=213519&amp;in_title_formatting=UB\" target=\"_blank\" rel=\"noopener nofollow\">notice to navigation interests<\/a> closed Lock 9 for four 12-hour stretches, 7 a.m. to 7 p.m. on July 14, 16, 21 and 23, so crews could swap all four main chamber miter gates. Traffic went back through the lock between closures. It&#8217;s a pretty sensible way to do major surgery on a lock without cutting off barge traffic for days at a time.<\/p>\n<h2>Why replace gates that lasted 89 years?<\/h2>\n<p>You&#8217;d think a gate that&#8217;s still on the job after 89 years has earned the right to stay. But Jim Cook, the Corps project manager who oversaw the swap, says those gates had a design life of 50 years. Careful maintenance and regular inspections stretched that by almost another 50, which is frankly a solid run for steel that spends its whole life underwater taking hits from barges.<\/p>\n<p>Still, they weren&#8217;t going to last forever. The <a href=\"https:\/\/www.pdccourier.com\/area-news\/crawford-county\/new-miter-gates-installed-on-lock-and-dam-9\/\" target=\"_blank\" rel=\"noopener nofollow\">Courier Press<\/a>, the local weekly that covered the swap, cites a St. Paul District release describing the old gates as damaged and distressed by the end.<\/p>\n<p>The river has changed, too. Cook says the 1930s gates were built for the smaller, slower tows of that era, and the Corps designed the new ones around what it has learned since about winter ice and currents. He also told the Courier Press he expects the new leaves to stand up better to barge impacts and high water.<\/p>\n<p>So how much is 50% heavier in actual pounds? I can&#8217;t find a per-leaf weight in anything the Corps has published about Lock 9, so I&#8217;m not going to guess.<\/p>\n<p>The local paper did get the dimensions, though. According to the Courier Press, each one is 61.5 feet long and up to 6 feet thick, and, depending on where it sits in the lock, stands 27 to 33 feet tall. The chamber they close off is 110 feet wide and 600 feet long.<\/p>\n<p>There&#8217;s also a small counting quirk if you go digging through the coverage. The Corps describes the job as four miter gates. The Courier Press says the project replaced four gates made up of two leaves each, which works out to eight leaves.<\/p>\n<h2>The Quad Cities does the heavy lifting<\/h2>\n<div style=\"display: flex; flex-wrap: wrap; gap: 14px; margin: 24px 0;\">\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Original gates<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">1937<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">In service 89 years before the swap.<\/div>\n<div style=\"font-size: 10px; color: #94a3b8; line-height: 1.4; margin-top: 10px; opacity: 0.8;\">Source: Courier Press<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Lock closures<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">4 \u00d7 12 h<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">July 14, 16, 21 and 23, 7 a.m. to 7 p.m. Open to traffic in between.<\/div>\n<div style=\"font-size: 10px; color: #94a3b8; line-height: 1.4; margin-top: 10px; opacity: 0.8;\">Source: USACE navigation notice 213519<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #dc2626; position: relative;\">\n<div style=\"position: absolute; top: -10px; right: 16px; background: #dc2626; color: #fff; font-size: 10px; font-weight: bold; letter-spacing: 1.2px; padding: 4px 10px; border-radius: 20px;\">NEW GATES<\/div>\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Weight vs. old gates<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">+50%<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">Same length, width and height as the 1937 gates.<\/div>\n<div style=\"font-size: 10px; color: #94a3b8; line-height: 1.4; margin-top: 10px; opacity: 0.8;\">Source: USACE St. Paul District (DVIDS)<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Barges through Lock 9<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">~4,900<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">2025 season, about 8.6 million tons of cargo.<\/div>\n<div style=\"font-size: 10px; color: #94a3b8; line-height: 1.4; margin-top: 10px; opacity: 0.8;\">Source: USACE St. Paul District<\/div>\n<\/div>\n<\/div>\n<p>None of this happens without the crane. The St. Paul District lists The Quad Cities as a 500-ton heavy-lift crane, and it works off a barge, which is pretty much the only practical way to pull a gate leaf out of a lock in the middle of the Mississippi and set a new one in its place.<\/p>\n<p>Cook told the Courier Press the parts are heavy enough that one crane has to handle the gate itself and hold it steady, while smaller cranes deal with pieces like the pins that set each leaf in position. As far as I can tell, The Quad Cities has become the Corps&#8217; go-to tool on the upper Mississippi whenever a gate has to come out of the water.<\/p>\n<p>Heavier doors also need stronger hinges. On a miter gate, those hinges are called anchorages, and the Corps replaced Lock 9&#8217;s first. That was a $1.5 million project that ran from late 2024 into February 2025, according to the Courier Press, and Cook&#8217;s explanation for it was basically the door-and-hinge logic you&#8217;d use at home.<\/p>\n<p>Building the gates took two years at a plant in Alabama, and they came up the river system by barge, per the district. The Courier Press names the builder as G&amp;G Steel, of Russellville, Alabama. Cook says the four-day installation was the end of four to five years of work, and that the project stayed inside the Corps from start to finish, with St. Paul&#8217;s maintenance and repair crew working alongside Rock Island. His verdict is that &#8220;it&#8217;s pretty impressive when you see it,&#8221; and I&#8217;m inclined to agree with him. Pulling a door the height of a three-story building out of a working lock and dropping a heavier one into the same hole, in four 12-hour windows spread over 10 days, isn&#8217;t exactly a weekend project.<\/p>\n<h2>So how busy is Lock 9?<\/h2>\n<p>It&#8217;s not a sleepy backwater lock. During 2025, the Corps handled 1,478 commercial lockages there, below the 10-year average of 1,830.<\/p>\n<p>Those lockages moved around 8.6 million tons of cargo, or roughly 4,900 barges, according to the St. Paul District&#8217;s season numbers. That&#8217;s a lot of grain riding on a set of doors from the Roosevelt administration. Cook&#8217;s argument is that barges are the cheapest and cleanest way to haul that kind of bulk load, and it&#8217;s hard to argue with him when you look at how many trucks it&#8217;d take to replace them.<\/p>\n<p>We&#8217;ve covered this kind of old-machine-out, new-machine-in job before, with the <a href=\"https:\/\/www.autonocion.com\/us\/400-ton-generator-70-years-275-ton-rotor-new-turbine-runner-south-dakota-dam\/\">400-ton generator at South Dakota&#8217;s Fort Randall Dam<\/a>. The Lock 9 swap is a far smaller project than the <a href=\"https:\/\/www.autonocion.com\/us\/1000-foot-freighters-one-lock-soo-1200-foot-twin\/\">1,200-foot lock the Army is building at the Soo<\/a>, but it&#8217;s arguably just as important to the people who work this stretch of river.<\/p>\n<p>The St. Paul District published its wrap-up of the Lock 9 job on August 11, and it says it&#8217;s working its way through the miter gates at every lock from 2 to 10. As for the 1937 gates, the Courier Press reports they&#8217;re headed for scrap.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pretty much everyone has a door at home that&#8217;s seen better days. It sticks a little, the hinges complain, and &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"An 89-year-old lock gate on the upper Mississippi was lifted out by a 500-ton floating crane and replaced in a 12-hour closure, one of eight steel leaves up to 33 feet tall swapped in four closures at a lock that passes close to 5,000 barges a year\" class=\"read-more button\" href=\"https:\/\/www.autonocion.com\/us\/89-year-old-lock-gate-mississippi-500-ton-floating-crane\/#more-28099\" aria-label=\"Read more about An 89-year-old lock gate on the upper Mississippi was lifted out by a 500-ton floating crane and replaced in a 12-hour closure, one of eight steel leaves up to 33 feet tall swapped in four closures at a lock that passes close to 5,000 barges a year\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":28098,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[121],"tags":[],"class_list":["post-28099","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","resize-featured-image"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/28099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/comments?post=28099"}],"version-history":[{"count":2,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/28099\/revisions"}],"predecessor-version":[{"id":28112,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/28099\/revisions\/28112"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/media\/28098"}],"wp:attachment":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/media?parent=28099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/categories?post=28099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/tags?post=28099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}