{"id":26191,"date":"2026-11-07T12:30:00","date_gmt":"2026-11-07T17:30:00","guid":{"rendered":"https:\/\/www.autonocion.com\/us\/?p=26191"},"modified":"2026-11-07T07:19:03","modified_gmt":"2026-11-07T12:19:03","slug":"80-kilowatt-wave-buoy-three-sections-bilbao-bay-of-biscay","status":"publish","type":"post","link":"https:\/\/www.autonocion.com\/us\/80-kilowatt-wave-buoy-three-sections-bilbao-bay-of-biscay\/","title":{"rendered":"An 80-kilowatt wave-power buoy built in three sections small enough to travel by road is headed for the dock in Bilbao, where it&#8217;ll be put back together and towed out into the Bay of Biscay, and it won&#8217;t feed the grid until its three swappable generator modules go in next spring"},"content":{"rendered":"<p>If you&#8217;ve ever been flattened by a wave at the beach, you don&#8217;t need me to tell you the ocean packs a punch. Getting that punch into a power line is a whole different problem. Engineers have been chasing wave power for decades, and it&#8217;s still mostly stuck at test sites and small demonstration plants while wind and solar have gone mainstream.<\/p>\n<p>So it&#8217;s kind of refreshing to see a wave energy update that&#8217;s mostly about road transport and maintenance.<\/p>\n<p>Carnegie Clean Energy, an Australian company listed on the ASX, told investors on October 29 that it&#8217;s finished building the buoy at the center of its CETO wave energy system. The buoy was made locally in the Basque Country, in northern Spain, and it was designed as three separate sections to make it easier to move by road.<\/p>\n<p>Those sections are headed to the Port of Bilbao. Carnegie plans to put them back together on the dock, fit extras like fenders, lift the finished buoy into the water and tow it out to its test berth. You can read the whole update in <a href=\"https:\/\/cdn-api.markitdigital.com\/apiman-gateway\/ASX\/asx-research\/1.0\/file\/2924-03155046-6A1352313\" target=\"_blank\" rel=\"noopener nofollow\">Carnegie&#8217;s ASX filing<\/a>.<\/p>\n<p>Carnegie calls the buoy a buoyant actuator, which is a pretty grand name for what&#8217;s basically a big submerged float. The company describes it as the system&#8217;s prime mover, and it wants to start deploying it this month.<\/p>\n<h2>So what is CETO?<\/h2>\n<p>A lot of the wave machines you&#8217;ve probably seen photos of bob around on the surface or sit inside a breakwater. CETO doesn&#8217;t. Its buoy sits fully submerged, a few yards under the surface, and it&#8217;s tied to the seabed by three tethers.<\/p>\n<p>As waves roll over the top, the buoy gets shoved around, and that pulls on the tethers. Inside the buoy, a power take-off turns the pull on those lines into rotation that spins a generator.<\/p>\n<p>If you haven&#8217;t run into the term before, a power take-off is just the bit of a machine that turns movement into useful power. On a wave device, it&#8217;s basically the drivetrain. Wave Energy Scotland, one of the two agencies running the <a href=\"https:\/\/www.europewave.eu\/news\/ceto-phase3-update2026\" target=\"_blank\" rel=\"noopener nofollow\">EuropeWave program<\/a> that&#8217;s backing this project, compares Carnegie&#8217;s version to a winch.<\/p>\n<p>Carnegie&#8217;s control system can also shift the buoy&#8217;s position and angle in the water. Wave Energy Scotland says that helps it soak up more energy and ride out rough seas, and it claims the current design can capture nearly twice as much energy as the one Carnegie deployed before. That&#8217;s a program talking up a technology it chose to fund, so I&#8217;d treat that number as a target until real sea data comes in.<\/p>\n<h2>So why build it in pieces?<\/h2>\n<p>Road transport is the reason Carnegie gives for the three sections. But the modules that go inside the buoy are where things get more interesting.<\/p>\n<p>During fabrication, Carnegie ran physical fit tests that confirmed three power take-off modules and one electrical module can all be slotted into the buoy and pulled back out again. The company says any of them can be swapped for a spare, which should mean a quick turnaround whenever the machine needs maintenance. SKF, the Swedish bearing giant, is assembling the power take-off modules, and the electrical module was put together with a Basque supplier called SEI.<\/p>\n<p>That might sound like a minor engineering footnote. I&#8217;d argue it&#8217;s one of the more sensible things in the whole announcement. The ocean is a lousy place to fix anything. Every trip out needs a boat, a crew and a decent weather window. And the Bay of Biscay in winter doesn&#8217;t hand those out very often.<\/p>\n<p>So say one of the generators acts up in February. Instead of sending people out to work on it at sea, the idea is that the faulty module gets lifted out, a spare goes in, and the broken one gets fixed in a workshop ashore.<\/p>\n<p>What Carnegie hasn&#8217;t spelled out in this update is whether that swap happens at sea or whether the buoy has to be towed back to port first. That&#8217;s a pretty big detail, since it decides how quick that turnaround really is.<\/p>\n<h2>What happens this month?<\/h2>\n<p>The first stage, which Carnegie says starts in November, covers the buoy and an initial mooring system at its berth on the Biscay Marine Energy Platform, or BiMEP. The power take-off modules won&#8217;t be inside yet. Carnegie says this round is meant to check the buoy&#8217;s hydrostatic characteristics, how well it tows and whether the local offshore supply chain can handle the job.<\/p>\n<p>Hydrostatics sounds intimidating, but it&#8217;s basically the question of whether the thing floats and sits in the water the way the computer models said it would. It&#8217;s a pretty important box to check before you fill it with expensive generators.<\/p>\n<p>So does that mean this buoy&#8217;s about to start feeding Spain&#8217;s grid?<\/p>\n<p>Not this year. Carnegie plans to finish assembling the power take-off modules, test them onshore with the electrical module and controls, and then take them to port to be fitted into the buoy. The full system is supposed to be deployed and connected to the grid next spring, once the Basque winter is over and the weather windows for that kind of work get better. I can&#8217;t blame them. I wouldn&#8217;t want to be hooking up a power cable off northern Spain in January either.<\/p>\n<div style=\"display: flex; flex-wrap: wrap; gap: 14px; margin: 24px 0;\">\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Stage 1 \u00b7 November<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">Buoy only<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">Initial mooring at the BiMEP berth. Tests flotation, towing and the local supply chain. No power take-off modules aboard.<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #1e293b;\">\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Swappable modules<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">3 + 1<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">Three power take-off modules and one electrical module, all fit-tested to slide in and out of the buoy.<\/div>\n<\/div>\n<div style=\"flex: 1 1 260px; min-width: 260px; background: #0f172a; color: #f1f5f9; border-radius: 14px; padding: 22px; border: 1px solid #dc2626; position: relative;\">\n<div style=\"position: absolute; top: -10px; right: 16px; background: #dc2626; color: #fff; font-size: 10px; font-weight: bold; letter-spacing: 1.2px; padding: 4px 10px; border-radius: 20px;\">TARGET<\/div>\n<div style=\"font-size: 11px; letter-spacing: 1.8px; text-transform: uppercase; color: #f87171; margin-bottom: 14px; font-weight: 600;\">Stage 2 \u00b7 Next spring<\/div>\n<div style=\"font-size: 30px; font-weight: 800; line-height: 1; margin-bottom: 6px;\">80 kW<\/div>\n<div style=\"font-size: 12px; color: #94a3b8; line-height: 1.4;\">Full system deployed and grid connected. Rated output of the scaled demonstrator, per Carnegie.<\/div>\n<\/div>\n<\/div>\n<h2>BiMEP is a busy little patch of ocean<\/h2>\n<p>BiMEP is a test site run by the Basque Energy Agency off Armintza, a small coastal village not far from Bilbao. According to PRIMRE, a US marine energy database, the site starts at least a mile offshore, sits in 164 to 295 feet of water, covers about 2 square miles that are closed to shipping and has 20 megawatts of grid connection split across four 5-megawatt hookups.<\/p>\n<p>If the name rings a bell, it&#8217;s the same test site where a Basque spar buoy called <a href=\"https:\/\/www.autonocion.com\/us\/buoy-bilbao-spanish-grid\/\">MARMOK-A-5<\/a> was towed out earlier this year. Both machines made it into the final phase of EuropeWave, and the Basque coast already has a much older wave plant built into the <a href=\"https:\/\/www.autonocion.com\/us\/america-wave-power-vs-spanish-australia\/\">Mutriku breakwater<\/a>.<\/p>\n<p>The machine Carnegie&#8217;s sending out is a scaled demonstrator rated at 80 kilowatts. That isn&#8217;t much. It&#8217;s a test rig built to produce data, and Carnegie&#8217;s also developing a separate 6-megawatt CETO array project at BiMEP, which gives you a sense of where it wants this to go if the demonstrator works out.<\/p>\n<p>One thing you won&#8217;t find in the filing is how big the buoy actually is. Carnegie doesn&#8217;t give a diameter or a weight, which is a little frustrating when the headline feature is a design that comes apart to travel by road. Hopefully the photos from the Bilbao dock fill in that gap.<\/p>\n<h2>Carnegie has done this before, sort of<\/h2>\n<p>This isn&#8217;t the first time CETO has gone in the water. About a decade ago, Carnegie installed CETO 5 units off Garden Island in Western Australia for the <a href=\"https:\/\/arena.gov.au\/projects\/perth-wave-energy-project\" target=\"_blank\" rel=\"noopener nofollow\">Perth Wave Energy Project<\/a>, which supplied HMAS Stirling, the country&#8217;s largest naval base. The Australian Renewable Energy Agency put A$13.09 million into that project.<\/p>\n<p>Those older units worked a bit differently. ARENA says the high-pressure water they produced could also feed a reverse osmosis desalination plant, so the base could get fresh water as well as power. The Spanish demonstrator keeps the electrical gear inside the buoy, in those swappable modules.<\/p>\n<p>The timeline has slipped, though. EuropeWave&#8217;s July update had the first stage of offshore deployment penciled in for October, and it&#8217;s now November. Carnegie&#8217;s own Spain page still says the machine should be in the water and generating this year, while the latest filing pushes the grid hookup to next spring.<\/p>\n<p>Carnegie doesn&#8217;t dodge it. The filing says the project has run past its original schedule because of first-of-a-kind manufacturing problems and supply chain delays, plus extra time for engineering validation and installation planning. Carnegie adds that this is &#8220;common for first-of-a-kind offshore energy systems.&#8221;<\/p>\n<p>Frankly, that&#8217;s fair. Offshore prototypes slipping by a month or a season is pretty normal, and I&#8217;d much rather see a company admit it in a filing than quietly move the goalposts.<\/p>\n<p>Carnegie won a \u20ac3.75 million (a little over $4 million) EuropeWave contract to deliver and run the machine in Spain. The project also has backing from the Spanish government&#8217;s RENMARINAS DEMOS program and from the Basque government through the Basque Energy Agency.<\/p>\n<p>If the buoy does go out this month, we should hear about it soon. Carnegie CEO Jonathan Fi\u00e9vez is scheduled to walk investors through the deployment in a webinar on November 18.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you&#8217;ve ever been flattened by a wave at the beach, you don&#8217;t need me to tell you the ocean &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"An 80-kilowatt wave-power buoy built in three sections small enough to travel by road is headed for the dock in Bilbao, where it&#8217;ll be put back together and towed out into the Bay of Biscay, and it won&#8217;t feed the grid until its three swappable generator modules go in next spring\" class=\"read-more button\" href=\"https:\/\/www.autonocion.com\/us\/80-kilowatt-wave-buoy-three-sections-bilbao-bay-of-biscay\/#more-26191\" aria-label=\"Read more about An 80-kilowatt wave-power buoy built in three sections small enough to travel by road is headed for the dock in Bilbao, where it&#8217;ll be put back together and towed out into the Bay of Biscay, and it won&#8217;t feed the grid until its three swappable generator modules go in next spring\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":26192,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[116],"tags":[],"class_list":["post-26191","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","resize-featured-image"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/26191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/comments?post=26191"}],"version-history":[{"count":2,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/26191\/revisions"}],"predecessor-version":[{"id":26209,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/posts\/26191\/revisions\/26209"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/media\/26192"}],"wp:attachment":[{"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/media?parent=26191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/categories?post=26191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autonocion.com\/us\/wp-json\/wp\/v2\/tags?post=26191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}