{"version":"1.0","provider_name":"Autonotion","provider_url":"https:\/\/www.autonocion.com\/us","author_name":"Luis Reyes","author_url":"https:\/\/www.autonocion.com\/us\/author\/luisreyes\/","title":"A California data center has run for two years with no power line at all, making its own electricity from hydrogen and cooling its 1,800 GPUs with the water that drips out of the fuel cells, and it just ordered stacks for a bigger one","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"4hIXS542Hv\"><a href=\"https:\/\/www.autonocion.com\/us\/california-data-center-hydrogen-gpus\/\">A California data center has run for two years with no power line at all, making its own electricity from hydrogen and cooling its 1,800 GPUs with the water that drips out of the fuel cells, and it just ordered stacks for a bigger one<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/www.autonocion.com\/us\/california-data-center-hydrogen-gpus\/embed\/#?secret=4hIXS542Hv\" width=\"600\" height=\"338\" title=\"&#8220;A California data center has run for two years with no power line at all, making its own electricity from hydrogen and cooling its 1,800 GPUs with the water that drips out of the fuel cells, and it just ordered stacks for a bigger one&#8221; &#8212; Autonotion\" data-secret=\"4hIXS542Hv\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/www.autonocion.com\/us\/wp-includes\/js\/wp-embed.min.js\n<\/script>\n","thumbnail_url":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/07\/ECL-MV-1-hydrogen-data-center-Mountain-View-768x432.jpg","thumbnail_width":600,"thumbnail_height":338}